Go Back   Jeep Garage - Jeep Forum > JeepGarage Vendors > Fields Jeep Chrysler Dodge Ram

Join Jeep Garage Today
 
 
Thread Tools Display Modes
 
  #1  
Old 02-24-2012, 07:51 PM
Member
My Jeep: 2014 5.7L WK2
 
Join Date: Aug 2010
Location: Lindenhurst, IL
Posts: 494
Thanks: 17
Thanked 144 Times in 76 Posts
Rep Power: 291292
Pat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond reputePat@FieldsAuto has a reputation beyond repute
Order Status Codes

<TABLE dir=ltr border=1 cellSpacing=0 cellPadding=7 width=751><TBODY><TR><TD height=439 vAlign=top width="50%">Order Status Codes
</TD><TD height=439 vAlign=top width="50%">Unscheduled
BX – good order available for scheduling
BB – fleet order only – review by Bid Dept
BD – special equipment processing
BE – edit error – coding error must be corrected before schedule
BG – order has passed edit but not considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B - build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA - cancelled order
Scheduled
C – tentative schedule
D – firm schedule; number is assigned
D1 –gateline: plant has sequenced the unit for production,
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O - delayed/received
KZ OA – plant hold, quality audit
KZ OB - zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest order, strike-bound hold, emission or safety hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction

</TD></TR></TBODY></TABLE>
__________________
------------------------
Patrick O'Donnell(pat@fieldsauto)
Fields Chrysler Jeep Dodge Ram
2800 Patriot blvd
Glenview, IL, 60026
847-446-5100 main
pat@fieldsauto.com
www.fieldschryslerjeepdodge.com
The Following User Says Thank You to Pat@FieldsAuto For This Useful Post:
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Status codes eternollie Grand Cherokee - WK2 - 3 03-24-2011 12:10 PM
SUMMIT Order Status...tracking... Dan JGC Grand Cherokee - WK2 - 8 01-22-2011 01:59 AM
Building Status Codes nek121328 Grand Cherokee - WK2 - 13 12-10-2010 07:20 PM
possible to change order when in D1 status? azcats2 Grand Cherokee - WK2 - 2 09-21-2010 08:12 PM

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 01:26 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Copyright 2012 - JeepGarage.Org
The Jeep Grand Cherokee Owners Community