Build status thread for Overlands with Tech package

I think it would be helpful for those of us waiting for Overlands with the tech package to know the status of others. I ordered mine more than three weeks ago (9/18). Also ordered mineral grey and saddle interior. Still in "C" status. I called jeep customer service today and they had no idea when it would go into production or be delivered. Anyone with the tech package in anything other than "C" status.
__________________

__________________
Reply With Quote
  #2  
Old 10-11-2010, 08:40 PM
Premium Member
 
Join Date: Sep 2010
Posts: 383
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1791
bpmcgee is on a distinguished road
Re: Build status thread for Overlands with Tech package

Not me. 4x4 overland v6 saddle, tech package ordered 10/1. Status C.
__________________

__________________
Reply With Quote
  #3  
Old 10-11-2010, 08:43 PM
Scottina06's Avatar
JeepGarage Founder
My Jeep: 2014 6.4L SRT8 WK2
 
Join Date: May 2009
Location: Berea, Kentucky
Posts: 48,846
Thanks: 833
Thanked 823 Times in 634 Posts
Rep Power: 7717427
Scottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond reputeScottina06 has a reputation beyond repute
Garage
Re: Build status thread for Overlands with Tech package

the tech pack doesnt start production till like 11/18?
__________________
SCOTT
The HARDER you work...the LUCKIER you are!
2014 REDLINE red Jeep SRT "BLOODIED Edition" 1 of 1
Previous JEEP rides-
2013 Jeep Grand Cherokee SRT-deep cherry
2013 JKU 10th anniversary-white
2006 Jeep Grand Cherokee Laredo-inferno red



Twitter-The_Jeep_Guy
Instagram-thejeep_guy

Reply With Quote
  #4  
Old 10-11-2010, 09:02 PM
jonesark's Avatar
Premium Member
 
Join Date: Sep 2010
Location: The South
Posts: 593
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2001
jonesark is on a distinguished road
Re: Build status thread for Overlands with Tech package

Quote:
Originally Posted by Scottina06 View Post
the tech pack doesnt start production till like 11/18?
That's what I'm being told as well.....


I ordered (see signature).
__________________
2011 Jeep Grand Cherokee
Overland 4x4 Hemi
Stone White, Saddle, ACC Package
Ordered Sep 21st 2010
VIN assigned Oct 25th 2010
D1 Dec 10th 2010
Estimated Delivery Jan 7th 2011
Delivered Jan 12th 2011
Reply With Quote
  #5  
Old 10-12-2010, 12:02 AM
Curly's Avatar
Member
My Jeep: 2011 5.7L WK2
 
Join Date: Oct 2010
Posts: 81
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1476
Curly is on a distinguished road
Re: Build status thread for Overlands with Tech package

Ordered mine on 9/16 and still in "C" status. Looks like it's going to be a long wait.
__________________
Reply With Quote
  #6  
Old 10-12-2010, 12:54 AM
Member
My Jeep: 2011 3.6L WK2
 
Join Date: Aug 2010
Location: CT USA
Posts: 66
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1505
mrctdare is on a distinguished road
Re: Build status thread for Overlands with Tech package

Mine too still in C status it shows order went in on 9/20 at dealer though calling the help line and they can never find my order and I end up calling the dealer to hear I'm still in C status.

I'm hoping that the chrome rims can be ordered this week and that they let me add it my order since I think the rims are set for November also. I have heard as long as It has not hit D status yet that you can have your dealer call the factory rep to update the orders.
__________________
Reply With Quote
  #7  
Old 10-12-2010, 07:55 AM
yukon's Avatar
Premium Member
My Jeep: 2014 3.6L WK2
 
Join Date: Sep 2010
Location: Westland, MI
Posts: 292
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1706
yukon is on a distinguished road
Re: Build status thread for Overlands with Tech package

Overland, 5.7, Blackberry, ACC (tech. pkg.), d/l beige.....ordered 9/17. Dealer, at order, told me 6 to 8 weeks. Chrysler support says status is "C" and not to call until first of Nov. for more info. As reported here on another thread tech. pkg. should go to production about 2 months after release to order, that was 9/16, so look for "D" about 11/16......
__________________
Reply With Quote
  #8  
Old 10-12-2010, 08:33 AM
Member
My Jeep: 2011 WK2
 
Join Date: Aug 2010
Location: New York City
Posts: 344
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1780
bozer is on a distinguished road
Re: Build status thread for Overlands with Tech package

What if you skipped on Tech Package and just got saddle?
__________________
Reply With Quote
  #9  
Old 10-12-2010, 08:52 AM
Premium Member
 
Join Date: Sep 2010
Posts: 383
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1791
bpmcgee is on a distinguished road
Re: Build status thread for Overlands with Tech package

Bozer, I ordered two overlands at the same time -- one 3.6 with saddle and tech, one 5.7 with saddle but without tech. Ordered 10/1

No-Tech (5.7) is status "D" with a VIN.
Tech (3.6) is status "C" without a VIN.
__________________
Reply With Quote
  #10  
Old 10-12-2010, 09:45 AM
Member
My Jeep: 2011 WK2
 
Join Date: Aug 2010
Location: New York City
Posts: 344
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1780
bozer is on a distinguished road
Re: Build status thread for Overlands with Tech package

So what's better, C or D?

Please tell me D is "closer to arrival at my house"
__________________
Reply With Quote
  #11  
Old 10-12-2010, 09:50 AM
Premium Member
 
Join Date: Sep 2010
Location: brOOklyn
Posts: 1,239
Thanks: 0
Thanked 2 Times in 2 Posts
Rep Power: 2691
JoeSchmoe007 has a reputation beyond reputeJoeSchmoe007 has a reputation beyond repute
Re: Build status thread for Overlands with Tech package

D is better. Means you can roll around nekkid on brown leathery goodness real soon now.
__________________
Reply With Quote
  #12  
Old 10-12-2010, 10:11 AM
Premium Member
 
Join Date: Sep 2010
Posts: 383
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 1791
bpmcgee is on a distinguished road
Re: Build status thread for Overlands with Tech package

From wk2jeeps.com:

DaimlerChrysler Order Status Codes

Unscheduled
BA - BA new order that hasn't been checked/approved BB fleet order only review by Bid Department
BD special equipment processing
BE edit error coding error which must be corrected before the order can be considered for scheduling
BG order has passed edit but cannot be considered for scheduling
BG F finance hold automatic cancellation after 15 days
BG B model or option hold / build out hold
BG L material restriction hold
BG M material hold (fleet)
BX good order, available for scheduling
ZA cancelled order


Scheduled
C tentative schedule
D firm schedule: serial number is assigned.
D1 gateline: plant has sequenced the unit for production, estimated ship date assigned
D2 gateline: framing and build imminent, usually within 3-6 days

Note: Once a vehicle reaches scheduled (C or D) status, it cannot be cancelled by the dealer. Orders can sit in D-status for up to 60 days.

Build
E framing
F paint
G trim


Built
I unit is pending final inspection
J vehicle has passed final inspection, but has not been released to carrier
JB shipped to body vendor
JE shipped to emissions
JJ consigned body vendor
JS shipped to storage
KZ released by plant and invoiced
Note: Vehicles must reach KZ-status before an invoice can be generated.

Traffic Codes
KZ L released but not shipped
KZ M first rail departure
KZ N first rail arrival
KZ O delayed/received
KZ OA plant hold, quality audit
KZ OB zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE misdropped or misshipped vehicle
KZ OF shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH all other carrier codes that currently post an O delay code that are not included above
KZ R vehicle within a few days of arrival to dealer
KZ T second rail departure
KZ U second rail arrival
KZ X delivered to dealer
KZ Y1 major damage must not be sold as new
KZ Y2 major damage vehicle sold at auction
__________________

__________________
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
NEW Build status tracking By Milous for site supporters Scottina06 Grand Cherokee - WK2 - 490 07-08-2014 01:06 AM
Build Status Tracking vonk Grand Cherokee - WK2 - 5 08-15-2010 09:51 AM

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 04:18 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Copyright 2012 - JeepGarage.Org
The Jeep Grand Cherokee Owners Community