Jeep Garage  - Jeep Forum

Jeep Garage - Jeep Forum (http://www.jeepgarage.org/forums.php)
-   Grand Cherokee - WK2 - (http://www.jeepgarage.org/f73/)
-   -   Build status thread for Overlands with Tech package (http://www.jeepgarage.org/f73/build-status-thread-for-overlands-with-tech-package-13870.html)

rdalcanto 10-11-2010 08:31 PM

Build status thread for Overlands with Tech package
 
I think it would be helpful for those of us waiting for Overlands with the tech package to know the status of others. I ordered mine more than three weeks ago (9/18). Also ordered mineral grey and saddle interior. Still in "C" status. I called jeep customer service today and they had no idea when it would go into production or be delivered. Anyone with the tech package in anything other than "C" status. :mad:

bpmcgee 10-11-2010 08:40 PM

Re: Build status thread for Overlands with Tech package
 
Not me. 4x4 overland v6 saddle, tech package ordered 10/1. Status C.

Scottina06 10-11-2010 08:43 PM

Re: Build status thread for Overlands with Tech package
 
the tech pack doesnt start production till like 11/18?

jonesark 10-11-2010 09:02 PM

Re: Build status thread for Overlands with Tech package
 
Quote:

Originally Posted by Scottina06 (Post 283088)
the tech pack doesnt start production till like 11/18?

That's what I'm being told as well.....


I ordered (see signature).

Curly 10-12-2010 12:02 AM

Re: Build status thread for Overlands with Tech package
 
Ordered mine on 9/16 and still in "C" status. Looks like it's going to be a long wait.

mrctdare 10-12-2010 12:54 AM

Re: Build status thread for Overlands with Tech package
 
Mine too still in C status it shows order went in on 9/20 at dealer though calling the help line and they can never find my order and I end up calling the dealer to hear I'm still in C status.

I'm hoping that the chrome rims can be ordered this week and that they let me add it my order since I think the rims are set for November also. I have heard as long as It has not hit D status yet that you can have your dealer call the factory rep to update the orders.

yukon 10-12-2010 07:55 AM

Re: Build status thread for Overlands with Tech package
 
Overland, 5.7, Blackberry, ACC (tech. pkg.), d/l beige.....ordered 9/17. Dealer, at order, told me 6 to 8 weeks. Chrysler support says status is "C" and not to call until first of Nov. for more info. As reported here on another thread tech. pkg. should go to production about 2 months after release to order, that was 9/16, so look for "D" about 11/16......:(

bozer 10-12-2010 08:33 AM

Re: Build status thread for Overlands with Tech package
 
What if you skipped on Tech Package and just got saddle?

bpmcgee 10-12-2010 08:52 AM

Re: Build status thread for Overlands with Tech package
 
Bozer, I ordered two overlands at the same time -- one 3.6 with saddle and tech, one 5.7 with saddle but without tech. Ordered 10/1

No-Tech (5.7) is status "D" with a VIN.
Tech (3.6) is status "C" without a VIN.

bozer 10-12-2010 09:45 AM

Re: Build status thread for Overlands with Tech package
 
So what's better, C or D?

Please tell me D is "closer to arrival at my house"

JoeSchmoe007 10-12-2010 09:50 AM

Re: Build status thread for Overlands with Tech package
 
D is better. Means you can roll around nekkid on brown leathery goodness real soon now.

bpmcgee 10-12-2010 10:11 AM

Re: Build status thread for Overlands with Tech package
 
From wk2jeeps.com:

DaimlerChrysler Order Status Codes

Unscheduled
BA - BA new order that hasn't been checked/approved BB fleet order only review by Bid Department
BD special equipment processing
BE edit error coding error which must be corrected before the order can be considered for scheduling
BG order has passed edit but cannot be considered for scheduling
BG F finance hold automatic cancellation after 15 days
BG B model or option hold / build out hold
BG L material restriction hold
BG M material hold (fleet)
BX good order, available for scheduling
ZA cancelled order


Scheduled
C tentative schedule
D firm schedule: serial number is assigned.
D1 gateline: plant has sequenced the unit for production, estimated ship date assigned
D2 gateline: framing and build imminent, usually within 3-6 days

Note: Once a vehicle reaches scheduled (C or D) status, it cannot be cancelled by the dealer. Orders can sit in D-status for up to 60 days.

Build
E framing
F paint
G trim


Built
I unit is pending final inspection
J vehicle has passed final inspection, but has not been released to carrier
JB shipped to body vendor
JE shipped to emissions
JJ consigned body vendor
JS shipped to storage
KZ released by plant and invoiced
Note: Vehicles must reach KZ-status before an invoice can be generated.

Traffic Codes
KZ L released but not shipped
KZ M first rail departure
KZ N first rail arrival
KZ O delayed/received
KZ OA plant hold, quality audit
KZ OB zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE misdropped or misshipped vehicle
KZ OF shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH all other carrier codes that currently post an O delay code that are not included above
KZ R vehicle within a few days of arrival to dealer
KZ T second rail departure
KZ U second rail arrival
KZ X delivered to dealer
KZ Y1 major damage must not be sold as new
KZ Y2 major damage vehicle sold at auction


All times are GMT -5. The time now is 02:54 AM.

Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Copyright 2012 - JeepGarage.Org
The Jeep Grand Cherokee Owners Community