Jeep Garage  - Jeep Forum banner
281 - 299 of 586 Posts

· Registered
Joined
·
442 Posts
I fly up on the 22nd to pick up my GCL Summit/HEMI, Bright White/Tupelo. Best color combo in my opinion...I keep joking with my wife she's going to wish she went with it instead of Velvet Red/Steel Gray, LOL.

My wife's estimated delivery just moved forward to 10/27. If that holds true, I would want to take delivery of both at same time. The delivery of my order to the dealer actually was a day ahead of the most recently published date (still shows in-transit even though dealer has it). I really do not want to make two trips to that part of Virginia...
 

· Registered
Joined
·
4 Posts
I now recall you saying that you ordered yours on the same day that I ordered mine and thought it was odd that you could order the eLSD. I'm wondering if that is playing a role in your production date? I would be surprised if the rear entertainment is the issue as I would think that the rear entertainment system is likely to be installed by a separate contractor rather than on the production line (similar to the running boards).

EDIT: Just re-read Jake22's comment and it sounds like he has the eLSD so that would suggest that the eLSD is not the issue.
His is a Canadian build and he is a retired Jeep employee.
 

· Registered
Joined
·
3 Posts
Well I feel like progress is happening, but it is slow… I’m confident this larger engine Summit Reserve will be worth the wait…current status
  1. Confirmed June-22-2022
  2. Scheduled Sep-30-2022
  3. In Production - TBD
  4. Vehicle Built - TBD
  5. Shipped - TBD
  6. Delivered - TBD
 

· Registered
Joined
·
362 Posts
Well I feel like progress is happening, but it is slow… I’m confident this larger engine Summit Reserve will be worth the wait…current status
  1. Confirmed June-22-2022
  2. Scheduled Sep-30-2022
  3. In Production - TBD
  4. Vehicle Built - TBD
  5. Shipped - TBD
  6. Delivered - TBD
Mine is also scheduled September 30. No Production date yet.
 

· Registered
Joined
·
1,193 Posts
Well I feel like progress is happening, but it is slow… I’m confident this larger engine Summit Reserve will be worth the wait…current status
  1. Confirmed June-22-2022
  2. Scheduled Sep-30-2022
  3. In Production - TBD
  4. Vehicle Built - TBD
  5. Shipped - TBD
  6. Delivered - TBD
Did your order the L or 2 row?
I have the hemi in my L and it’s a proper amount of power. Not at all startling. But it’s graceful oomph.
I found where I live in the Rocky Mountains, the V6 was a bit underwhelming.
 

· Registered
Joined
·
33 Posts
As with all data the devil is in the details and getting more of it means we have a better sample size.

ordered-to-scheduled and scheduled-to-production are probably highly correlated to what you ordered (availability) and the dealer (backlog). That means both of these entries are likely not a great predictor.

production to built and built to shipped is probably going to be fairly uninform with some variance depending on what day of the week and if any holidays are between start/finish.

shipped to delivered is going to likely be location dependent but I wouldn't expect it to be very long in general.

Here is the current data. It would be awesome to get about 20 more samples though.

View attachment 244963
My GCL SR just moved to "In Production" on 10/19. Will keep you updated on built/shipped/delivered dates.
 

· Administrator
Joined
·
12,149 Posts
today is delivery day!
fingers crossed that it is perfect..
Congrats and I hope that the delivery goes smoothly!
 
281 - 299 of 586 Posts
Top